{"id":1701262,"date":"2024-05-14T12:34:03","date_gmt":"2024-05-14T11:34:03","guid":{"rendered":"https:\/\/www.swetic.org\/?post_type=document&#038;p=1701262"},"modified":"2024-06-24T18:27:38","modified_gmt":"2024-06-24T17:27:38","slug":"fos-2013-20-rev-1","status":"publish","type":"document","link":"https:\/\/www.swetic.org\/en\/dokument\/fos-2013-20-rev-1\/","title":{"rendered":"FOS 2013-20: Audit inspection and certificate at the 3-month rule"},"content":{"rendered":"<p><strong>Question: When and in what cases should the inspection body submit the certificate to the supervisory authority when applying the 3-month rule according to Chapter 2, Section 1, points 1-5 and so on in the event of a major change or replacement of a significant part of the lift?<\/strong><\/p>\n\n\n\n<p>Answer: The Swedish National Board of Housing, Building and Planning has responded to the question in a letter dated 2013-01-11 (Diary no. 1131-4518\/2012) (the chapter referred to refers to the Planning and Building Ordinance): <\/p>\n\n\n\n<p>\u201d&quot;Residual measures that have not been carried out therefore become deficiencies only after the three-month period has expired. At the latest then, the person who carried out the inspection must notify, in accordance with Chapter 5, Section 11, second paragraph of the Ordinance.&quot;\u201d<\/p>\n\n\n\n<p>Inspection companies that have approved objects during an audit inspection based on the so-called 3-month rule must therefore send the certificates to the supervisory authority for information no later than after 3 months unless a new audit inspection has been carried out\/the requirements of the regulation have been met. <\/p>\n\n\n\n<p>The certificate after an audit inspection according to the 3-month rule therefore states the following information text: <\/p>\n\n\n\n<p>NOTE! The certificate refers to a revision inspection with a 3-month validity. This means that the elevator is subject to additional requirements for reconstruction. The reconstruction must be completed and a new revision inspection carried out no later than \u2026\u2026\u2026\u2026 <\/p>\n\n\n\n<p>If we have not been notified of or have not carried out a new audit inspection by the date specified above, a copy of this certificate will be sent to the Building Committee for information.<\/p>\n\n\n\n<p><em>Last revised 20180417, 1 revision.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Question: When and in what cases should the inspection body submit the certificate to the supervisory authority when applying the 3-month rule according to Chapter 2, Section 1, Sections 1-5 and above in the event of a major change or replacement of a significant part of the elevator? Answer: The National Board of Housing, Building and Planning has responded to the question in a letter dated 2013-01-11 (Diary no. 1131-4518\/2012): &quot;Outstanding not carried out [...]<\/p>","protected":false},"template":"","meta":{"footnotes":""},"categories":[28,15],"class_list":["post-1701262","document","type-document","status-publish","hentry","category-fragor-och-svar","category-lyft"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.swetic.org\/en\/wp-json\/wp\/v2\/document\/1701262","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.swetic.org\/en\/wp-json\/wp\/v2\/document"}],"about":[{"href":"https:\/\/www.swetic.org\/en\/wp-json\/wp\/v2\/types\/document"}],"version-history":[{"count":5,"href":"https:\/\/www.swetic.org\/en\/wp-json\/wp\/v2\/document\/1701262\/revisions"}],"predecessor-version":[{"id":1701624,"href":"https:\/\/www.swetic.org\/en\/wp-json\/wp\/v2\/document\/1701262\/revisions\/1701624"}],"wp:attachment":[{"href":"https:\/\/www.swetic.org\/en\/wp-json\/wp\/v2\/media?parent=1701262"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.swetic.org\/en\/wp-json\/wp\/v2\/categories?post=1701262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}